Outside work continues on the house and casita to finish up siding and get the roof installed.   If the weather cooperates enough this week we should be done with the majority of the exterior paint, siding and roofing.

Inside mechanical s finished up this week and inspection was completed.   Sheet rock work has started on some interior walls on one side to still give access to mechnicals as they fix a few items required by the inspector.

Foam insulation should start once the roof is on.